DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM

DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM

Click here to download our android mobile app to your phone  for more materials and others

Note: our case study can be change to suit your desire location . we are here for your success.

ORDER NOW

COMPLETE MATERIAL  COST  N2,500 Or $10.  FRESH  PROJECT MATERIAL  COST 50,000 NAIRA FOR UNDERGRADUATE, OTHERS 100,000 -200,000 NAIRA.

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 GTBANK
Account Name : Host Link Global Services Ltd
ACCOUNT NUMBER: 0138924237
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

Note:  We accept bank transfer, ATM cash transfer , Online payment using your ATM , Western union bank transfer.  We will respond to you anytime of the day. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

CALL OUR  CUSTOMERS CARE  OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 1 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

 

ABSTRACT
This project is based on the possible exploration of computer Technology in Today society in market surveying in the daily discharge of duties.
This project involves the design and development of computerized market survey report analysist.
The design will enable the user to achieve a desirable report at an increased efficiency, accuracy and speed of doing work and at the same time reduce man – hour repured for piece of work.
This calls for an alternative method which ie accurate, quick and inexpensive. This project achieved merit by eliminating all these flows that result from manual operation and present a very accurate, decisive and systematic measure of survey report.

TABLE OF CONTENT

CHAPTER ONE
1.0 Introduction
1.1 Background
1.2 Aim or objective of the study
1.3 Statement of the problem or purpose
1.4 Justification of the purpose topic
1.5 Scope of the project
Methodology
Block diagram
Thesis Organization

CHAPTER TWO
LITERATURE REVIEW

CHAPTER FIVE
3.0 overview of the existing system
3.1 Description and analysis of the existing system
3.2 Method of data collection
3.2.1 Interview method
3.2.2 Reference to written text
3.3 Input analysis
3.4 Process analysis
3.5 Output analysis
3.6 Input analysis
3.7 Problem of the existing system
3.8 Justification for the new system

CHAPTER FOUR
4.0 Design for the new system
4.1 Output specification and design
4.2 Input specification and design
4.3 File design
4.4 Procedure chart
4.5 System flowchart
4.6 System requirement

CHAPTER FIVE
Implementation
Program design
Program flowchart
Pseudo code
Source listing
Test-run
CHAPTER SIX
DOCUMENTATION

CHAPTER SEVEN
Recommendation & conclusion
Reference
Appendix (if any)
CHAPTER ONE

1.0 INTRODUCTION
In order not to embrace hitch in the carrying out of any project, it is necessary to define the objective of the project. The process surveying enable us to map out the limitation and the delimitation of the project.
In surveying, we set out the necessary steps and areas that considered to be useful and necessary to implement the objective.
In this case, we identify the problem, it’s sources, causes and to identify solutions to the problem.
In the case study of doing these, the objective must be certain.

1.1 BACKGROUND OF THE STUDY
The Background of this study involves indent study of the system report being designed to determine the input data to the report system and how system report objective can be realized.
Data collected or survey made determined the system output and input and grouped into various files (1) Equipment requirement.
EQUIPMENT REQUIREMENT: To use this report system in survey the following equipment may be needed.
i) An IBM or its compatible
ii) Magnetic Diskette (3.25 x 5.25 or 35 x 3.5 inches)
iii) An IBM line printer or its compatible
iv) A printer interface cable.
Optional equipment: Hard Disk Properly Installed.
MEMORY REQUIREMENT: The design of this system was highly structured by breaking the program in module using Top-Down design technique and loding the program in GW BASIC. Each program after use call another program from the diskette and pass over the content of relevant variable over to the incoming program by using “COMMON” statement it minimizes effectively the size of primary memory required by the system.
TEST DATA
The whole system was tested by obtaining survey analysis of previous building project. Fed the cost of sub-element into the system and compare the output.

DOCUMENTATION
This system is documented in a way that any one who is not a computer scientist or market surveyor can use it effectively. The following types of a documentation are implemented.
i) Design documentation
ii) Operational documentation

Leave a Reply

Your email address will not be published. Required fields are marked *