MATERIAL UTILIZATION SYSTEM IN MANUFACTURING ENTERPRISE.
(A CASE STUDY OF ASABA TEXTILE MILL LIMITED ASABA)
COMPLETE PROJECT MATERIAL COST 5000 NAIRA OR $10 ,
. A FRESH TOPIC NOT LISTED ON OUR WEBSITE COST 50,000 NAIRA ( UNDERGRADUATE) OR 100,000 FOR SECOND DEGREE STUDENTS. $500. PLUS FREE SUPPORT UNTIL YOU FINISH YOUR PROJECT WORK. CONTACT US TODAY, WE MAKE A DIFFERENT. DESIGN AND WRITING IS OUR SKILLED. DESIGN AND WRITING IS OUR SKILLED.
Note: our case study can be change to suit your desire location . we are here for your success.
ORDER NOW
Account Name : Chi E-Concept Int’l
ACCOUNT NUMBER: 0115939447
Account Name: Chi E-Concept Int’l
Account Name: 3059320631
Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
Account Number: 0117780667.
Swift Code: GTBINGLA
Dollar conversion rate for Naira is 175 per dollar.
ATM CARD: YOU CAN ALSO MAKE PAYMENT USING YOUR ATM CARD OR ONLINE TRANSFER. PLEASE CONTACT YOUR BANKER SECURITY GUIDE ON HOW TO TRANSFER MONEY TO OTHER BANKS USING YOUR ATM CARD. ATM CARD OR ONLINE BANK TRANSFER IS FASTER FOR QUICK DELIVERY TO YOUR EMAIL . OUR MARKETER WILL RESPOND TO YOU ANY TIME OF THE DAY. WE SUPPORT CBN CASHLESS SOCIETY.
OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.
form>DELIVERY PERIOD FOR BANK PAYMENT IS LESS THAN 2 HOURS
How to transfer from your bank account to All Nigeriabanks
1. Access Bank:
—-*901#
2. EcoBank:
—-*326#
3. Fidelity Bank:
—-*770#
4. FCMB:
—-*389*214#
5. First Bank
—-*894#
6. GTB:
—-*737#
7. Heritage Bank:
—-*322*030#
8. Keystone Bank:
—-*322*082#
9. Sky Bank:
—-*389*076*1#
10. Stanbic IBTC:
—-*909#
11. Sterling Bank:
—-*822#
12. UBA:
—-*389*033*1#
13. Unity Bank:
—-*322*215#
14. Zenith Bank:
—-*966#
15. Diamond Bank
—-*710*555#
To know your BVN, dial
—-*565*0#.
E.g for First bank… *894 *Amount *Acct. No. #
Please dail d code from d number u used to register d account from the bank
CALL OKEKE CHIDI C ON : 08074466939,08063386834.
AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO
08074466939 or 08063386834, YOUR PROJECT TITLE YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 2 HOURS ONCE WILL CONFIRM YOUR PAYMENT.
WE HAVE SECURITY IN OUR BUSINESS.
MONEY BACK GUARANTEE
Click here to download our android mobile app to your phone for more materials and others
CHAPTER ONE
- Introduction
- Statement of Problem
- Purpose of Study
- Hypothesis
- Significance of study
- Limitation
- Delimitation
- Definition of terms
CHAPTER TWO
- Review of Related Literature
- Source and Nature of Raw Material
- Planning material requirement
- Material utilization
- Need for material utilization
- Organizational responsibility for material utilization
- The purchasing policy of the mill
- Receiving and storage
- Stock taking method
- Stock level.
- Ordering cost
- The Economic Order Quantity (EOQ)
- The lead time
- Re- Order level (ROL)
- Minimum stock level
- The Re-order Quantity
- The Re-order Quantity
- The inventory quantity
- Valuation of inventory
CHAPTE THRE
- Research methodology
- Source of data
3.1.1 Primary data
- Secondary data
- Population and sample size
- Methodology used
CHAPTER FOUR
- The analysis of data and discussion
- Empirical Research into the manufacturing enterprise
- Discussion
CHAPTER FIVE
- Summary of results
- Summary of findings
- Conclusion
- Recommendation
- Appendix A: Organization chart of Asaba.
Textile mill Ltd
Appendix B: Percentage waste computation of material input in the processing/finishing department
Appendix C: Specimen of questionnaire used
CHAPTER ONE
- INTRODUCTION: A history of Bendel Textile mill Ltd as it was
called in the then defunct Bendel state but now renamed Asaba Textile mill Ltd immediately after the splitting of the state into Edo and Delta states in 1991, was incorporation in 1965.
It was located on the eastern side of the town, Asaba, the headquarters of Delta state. It is cited close to the Lagos-Onitsha Express way for easy accessibility. The mill was created to assist in the relief of unemployment and to reduce rural migration of people to urban areas.
Amongst other objectives of the firm are the manufacturing of textile fabric (100% cotton), modernization and expansion. However, the product line of the company is Africa print with a planned production capacity of 4000 metres per day. Crey cloth which is 10,560, 000 matres per annum taking twenty –two working days in a month. Both the production capacities so far achieved are 30,000 metres per day Grey baft that is 7920,000-metre p.a. The slack in the full capacity achievement is due to insufficient supply of raw material (R/M), high labour cost, high labour turnover mostly in the spinning and weaving departments at the beginning of every year and also the demechanization of machines. The company has to cannibalize to put some machines into operation and a colossal amount is spent on the importation of German expatriates to carry out the job of machine cannibalism.
Moreso, the mill has staff strength of 840 comprising Administration, factory workers, security unit and labourers. It has a total sale of over eighty million Naira (N80m) p.a.
The raw materials used by the mill are; cotton hint, chemical and dyestuff. Some are sourced locally while some are imported. Indian expatriates own the mill.
1.2 STATEMENT OF PROBLEM
. The mill has chains of problems as regards the utilization of materials. A lot of problems of wastage are being suffered in the mill conspicuous amongst which are:
- Drops of cotton on the factory floor in the spinning department. This is of a common sight. As the bales of cotton are being put into the bale opener (machine) and to the scotcher where it forms laps which is taken to the cording machine to form sliver, raw cotton are seen everywhere littering on the floor. The propping cottons should be swept up or hand picked by the workers. Also workers should be provided by the with apron for keeping the dropped picked up good cottons and should be sent back to the scotecher to form a new lap.
Roving waste: In the speed frame section the s