ANALYSIS OF PRODUCTION SYSTEM DESIGN AND MANAGEMENT IN THE SOFT DRINK INDUSTRY

ANALYSIS OF PRODUCTION SYSTEM DESIGN AND MANAGEMENT IN THE SOFT DRINK INDUSTRY

(A CASE STUDY OF LIMCA BOTTLING PLANT OKIGWE)

COMPLETE PROJECT  MATERIAL COST 5000 NAIRA OR $10 , 

. A FRESH TOPIC NOT LISTED ON OUR WEBSITE COST 50,000 NAIRA ( UNDERGRADUATE) OR 100,000 FOR SECOND DEGREE STUDENTS. $500. PLUS  FREE SUPPORT UNTIL YOU FINISH YOUR PROJECT WORK. CONTACT US TODAY, WE MAKE A DIFFERENT. DESIGN AND WRITING IS OUR SKILLED.  DESIGN AND WRITING IS OUR SKILLED.

Note: our case study can be change to suit your desire location . we are here for your success.

                                   ORDER NOW

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 
 GTBANK
Account Name : Chi E-Concept Int’l
ACCOUNT NUMBER:  0115939447
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

ATM CARD:  YOU CAN ALSO MAKE PAYMENT USING YOUR ATM CARD OR ONLINE TRANSFER. PLEASE CONTACT YOUR BANKER SECURITY GUIDE ON HOW TO TRANSFER MONEY TO OTHER BANKS USING YOUR ATM CARD. ATM CARD OR ONLINE BANK TRANSFER IS FASTER FOR QUICK DELIVERY TO YOUR EMAIL . OUR MARKETER WILL RESPOND TO YOU ANY TIME OF THE DAY. WE SUPPORT CBN CASHLESS SOCIETY. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

form>DELIVERY PERIOD FOR BANK PAYMENT IS  LESS THAN 2 HOURS

How to transfer from your bank account to All  Nigeriabanks

1. Access Bank:
—-*901#

2. EcoBank:
—-*326#

3. Fidelity Bank:
—-*770#

4. FCMB:
—-*389*214#

5. First Bank
—-*894#

6. GTB:
—-*737#

7. Heritage Bank:
—-*322*030#

8. Keystone Bank:
—-*322*082#

9. Sky Bank:
—-*389*076*1#

10. Stanbic IBTC:
—-*909#

11. Sterling Bank:
—-*822#

12. UBA:
—-*389*033*1#

13. Unity Bank:
—-*322*215#

14. Zenith Bank:
—-*966#

15. Diamond Bank
—-*710*555#

To know your BVN, dial
—-*565*0#.

E.g for First bank…   *894 *Amount *Acct. No. #

Please dail d code from d number u used to register d account from the bank

CALL OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 2 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

 

 

ABSTRACT

 

The utmost aim of this study is to clearly define the factors necessary for the design of an efficient production system with a medium scale industry as the case study.  It is also hoped that in the course of the study definition will be given to the design of a production system as it is manifested practically in commerce and industry

Taking Limca bottling  company Okeigwe as the case study it is aimed to find out if overall performance of production of the company is a direct consequence of the  nature of system and the criteria for the selection of the system design and management

In carrying out this research obvious efforts were direct towards the following

  1. Defining effective management procedures for operating efficient production system.
  2. To find how an efficient production system can leas to the provision of abundant goods and service and create employment opportunities.

Due to the nature of the study only those on the management level of the study, only those on analysis of data obtained and findings the researcher was able to conclude that:

  1. Effective management procedure will guarantee the operation of efficient production system
  2. There exist a relationship between production
  3. Efficient production system design can lead to provision of quality goods and service and also create employment opportunities

In concluding the work the researcher made the following recommendations:

  1. The company should hold firm to active strategy in production
  2. Work study should be carried by the company
  • The company has to source raw material locally
  1. They have to reduce their level of inventories
  2. Try to expand the existing market of their products

It is the opinion of the researcher that if the above recommendation are looked into the company stands to gain more.

 

 

TABLE OF CONTENT

CHAPTER ONE

  • Introduction
  • Historical background
  • Statement of problem
  • Significance of study
  • Objective of the study
  • Research question
  • Scope of study
  • Limitation of study
  • Definition of terms

 

CHAPTER TWO

  • Literature review
  • Scope of production management
  • Organization for business planning
  • Business planning under systems approach
  • Major steps in managerial planning
  • Identification of opportunities and threats
  • Implementation
  • Production system design
  • Facilities requirement
  • Impute acquisition
  • Production system review and evaluation
  • Employee performance appraisal

Reference

 

 

CHAPTER THREE

Research design and methodology

3.0     Introduction

  • Area of study
  • Population
  • Sample size determination
  • Instrument for data collection
  • Validation of the instrument
  • Reliability of the instrument
  • Method of data collection
  • Questionnaire distribution and retrieval

 

CHAPTER FOUR

4.1     DatA Presentation  and analysis

  • Presentation of data and  data analysis
  • Summary of finding

 

 

CHAPTER FIVE

5.1Discussion of finding

5.2 Conclusion

5.3Recommendation

5.4 suggestions for further studies

Reference

Bibliography

Questionnaire

CHAPETR ONE

 

  • INTRODUCTION

Planning and forecasting are all elements of efficient.

The industrial and overall development  of any nation in one way or the other is based on the efficiency in the production sector of the nations economy this efficiency can only be achieved through the adequate and proper utilization of all the factors of production in conjunction  with designing a good production system.

In analyzing production system the following decision are involved

Decision about the quality of production facilities required and their respective location’s need to be made; there are also decisions about the required level of performance  and  the more decision have to be made on the desired method of production and the management procedure that is to be introduces.

When all the above have been adequately  taken care of the task of operating the production system is then considered in tackling this problem the management will have to formulate the production scheduling and control quality control and inventory management.  To undertake    these operations efficiently they will need to be properly defined in their design as in their relationship to the production system  other wise management will run into a brick wall it is only when all facts of the  production system are sequentially organized that the system can be efficiently operated

 

  • HISTORICAL BACKGROUND

This Limca Bottlers Plc was incorporated in Nigeria in 1985- it is owned by an incline national at inception they opened a plant at Warri which is still being regarded as their head quarters.

The Okigwu plant of Limca bottlers was commissioned in May 15th 1973.  at the Okigwu plant they produce a range of three brands of soft drinks namely: Limca Gold spot and Pearle soda their production machines which includes the horst corller Hansa serving increasing and justice citer where all imported from harmony. The plant is located along the Enugu to Okigwe express road

 

  • STATEMENTS OF PROBLEM

The Nigeria nation is so complex and diversified that the we can not afford a poor production system design the attendant problems of  a poor production system design are numerous some of these are that it results to inefficiency in production which in turn leads to scarcity of goods and service which is a fall-out of constant break down in machines wastages in time and material delay in supplies and orders when  it is obvious all these are available coupled with very inferior method of production.

Poor organization may sometimes lead to a situation where the work standard in one sector being higher than in another sector with in the same production system leading to the production of substandard goods and service which may not meet market standard

Leave a Reply

Your email address will not be published. Required fields are marked *