DESIGN AND CONSTRUCTION OF AN ELECTRONIC DICE DISPLAY WITH AUDIO UNIT.
Click here to download our android mobile app to your phone for more materials and others
Note: our case study can be change to suit your desire location . we are here for your success.
ORDER NOW
COMPLETE MATERIAL COST N2,500 Or $10. FRESH PROJECT MATERIAL COST 50,000 NAIRA FOR UNDERGRADUATE, OTHERS 100,000 -200,000 NAIRA.
Account Name : Host Link Global Services Ltd
ACCOUNT NUMBER: 0138924237
Account Name: Chi E-Concept Int’l
Account Name: 3059320631
Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
Account Number: 0117780667.
Swift Code: GTBINGLA
Dollar conversion rate for Naira is 175 per dollar.
Note: We accept bank transfer, ATM cash transfer , Online payment using your ATM , Western union bank transfer. We will respond to you anytime of the day.
OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.
CALL OUR CUSTOMERS CARE OKEKE CHIDI C ON : 08074466939,08063386834.
AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO
08074466939 or 08063386834, YOUR PROJECT TITLE YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 1 HOURS ONCE WILL CONFIRM YOUR PAYMENT.
WE HAVE SECURITY IN OUR BUSINESS.
MONEY BACK GUARANTEE
ABSTRACT
This work deals extensively with the design and construction of an electronic dice display (EOD) with audio unit. The device displays the of a hudo dice in numberical form and also produces sound as it displays the number.
The device works with principle of chance employee by ludo game players. The output of the display is usually very rapid that the player does actually sex the number when the device is switched on so that it will purely be a game of chance. When the off key is pressed, a patellar number is displayed and this number is the number, the player got.
The operation of the device starts by the generation of a pulse frequency. The pulse frequency (square wave signal) generated by times (555 times) by connecting in an instable multibibrator. The output from this timer is used in clocking the binary counter (mod to counter) but this counter is biased to count just from zero through six (0-6) as we have in a lodo game dice. To achieve this bias in the mod 10 counter, the output from Qo, Q1 and Q2 were connected to the riset prins so that once the counter finishes the count of six or goes back to zero.
The result from the binary counter is then fed to the decoder driver before connecting it to seven segment so that the decoder will be able to covert the binary values to the decinal values that are being used in the ludo game dice. The seven segment then displays the numbers by lighting the diodes that make up that particular value.
This device is being regulated by a latch (4-edge triggered flipflope) which has two switches, one is used for putting the power supply and the other two push switches for the working of the dice display.
ORGANISATION OF WORK
The organization of this work is in seven chapters: the first on the introducing; the second is on the literature review; the thiod on the design of the system; the fourth deals with the construction (implementation); fifth on the testing and result (documentation); sixth on packaging and the seventh on the recommendation and conclusion.
The first chapter: introduction give a general view of what the electronic dice display (EDD) with audio unit is all about, it lists the components required, its aims and objectives, scope, limitations, problems and purpose of study.
The second chapter: literature review explains the different component, that make up the system, their makeup and how they operate.
The third deals on the design of the system, descrises vividly each component of the system, their operating modes, specifications and applications, schematic diagram of the system showing independent modules which function together to make up the system.
Construction, the fourth chapter deals with the actual construction of the system, the design requirement, theory of functioning of each module system, breakdown of the module specification and construction. Calculations and careful selection of the component values of each module are detailed in this chapter.
The fifth chapter which is on the documentation deals on the general description of the work, provides ease of maintenance and usage of the system.
Packaging, the sixth chapter lists the factors that were taken into consideration in the design and construction of the package.
The seventh and the last chapter, recommendation and conclusion gives a general view of what is conversed and the importance of this device. It also suggested certain areas for further studies.
CHAPTER ONE
INTRODUCTION 1
1.0 Statement of problem 1
1.1 purpose of study 2
1.2 Aims and objectives 2
1.3 Scope 3
1.4 Limitations 3
1.5 Definitions of terms 5
CHAPTER TWO
Literature Review 9
CHAPTER THREE
Description and Analysis of the Existing System 15
Organization structure 16
Objectives of the existing system 17
CHAPTER FOUR
Design of the New System 18
Output specification and design 20
Input specification and design 29
File design 38
Procedure chart 39
System flow chart 41
System requirement 42
CHAPTER FIVE
Implementation 47
Program flowchart 49
CHAPTER SIX
Documentation 51
CHAPTER SEVEN
Recommendation and Conclusion 53
7.1 Recommendation 53
7.2 Conclusion 53
Reference 55
CHAPTER ONE
INTRODUCTION
Instrumentation engineering has advanced widely with the introduction of medium scale integration (MSI), large scale integration (LSI) and very large scale intergration (VLSI). For purpose of accuracy and reliability, analogue instruments are being replaced by the digital ones. The electronic dice display (DD) with audio unit is among this new bread of instruments.
1.0 STATEMENT OF PROBLEM
The design of an electronic dice display is invented because of the quest for reducing strenuous activities encountered by man, especially in the area of its recreational activities. This device is used in indo game. The indo game in its manual operation can be manipulated by the experts so that it can no longer be a game of chance. Sometimes players can employ tricks on their opponents when playing the game, for example, of the both players are not vigilant, one of them can event thoart the dice and claimed that nothing happened. The players too may get tired after playing two or three times because of the stress in shaking and playing the dice, the frequent hitting of the dice’s can on the ludo board can even give cracks in the glass covering the ludo board. One can even experience the dice getting cost in the game because the dice is very small so if care is not taken it can fall out from the board. All these problems were taken into consideration before constructing the