DESIGN AND IMPLEMENTATION OF A COMPUTER BASED BILL OF MATERIAL PROCESSING SYSTEM.

DESIGN AND IMPLEMENTATION OF A COMPUTER BASED BILL OF MATERIAL PROCESSING SYSTEM

Click here to download our android mobile app to your phone  for more materials and others

Note: our case study can be change to suit your desire location . we are here for your success.

ORDER NOW

COMPLETE MATERIAL  COST  N2,500 Or $10.  FRESH  PROJECT MATERIAL  COST 50,000 NAIRA FOR UNDERGRADUATE, OTHERS 100,000 -200,000 NAIRA.

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 GTBANK
Account Name : Host Link Global Services Ltd
ACCOUNT NUMBER: 0138924237
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

Note:  We accept bank transfer, ATM cash transfer , Online payment using your ATM , Western union bank transfer.  We will respond to you anytime of the day. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

CALL OUR  CUSTOMERS CARE  OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 1 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

ABSTRACT

It has become very necessary to computerize the bill of material processing system in Nigeria due to the impact it has on the overall efficiency of the organization.

This project undertakes the computer-based bill of material processing system of Nigeria.

An in-depth study of the existing manual system is done and the problems encountered are noted. The need for a system is justified.

The new system is designed to solve the problems encountered in the old system.

Information management is made easier and efficiency is enhanced the benefits of the new system justify the cost and therefore these benefits cannot be over-emphasized.

TABLE OF CONTENTS

Title                                                                                         i

Certification                                                                                      ii

Dedication                                                                               iii

Acknowledgement                                                                  iv

Abstract                                                                                  v

Organization work                                                                            vi

Table of contents                                                                     viii

 

CHAPTER ONE

Introduction                                                                           1

  • Statement of problem 3
  • Purpose of study 4
  • Aims and objectives 5
  • Scope 5
  • Limitations 6
  • Assumptions 7
  • Definition of terms 7

 

CHAPTER TWO:

Literature review                                                                    12

 

CHAPTER THREE:

Description and analysis of the existing system.                     21

  • fact finding methods uses                                                 22
  • objectives of the existing system 23
  • input, process, output analysis 25
  • information flow diagram 30
  • problems of the existing system 31
  • justification for the new system 32

 

CHAPTER FOUR

Design of the new system                                                        35

  • out specifications and design 35
  • input specifications and design 40
  • file design 52
  • procedure chart 45
  • system requirements 45

 

CHAPTER FIVE

Implementation                                                                       48

  • program design 48
  • program flowcharts 50

 

CHAPTER SIX

Documentation                                                                        56

 

CHAPTER SEVEN

Recommendation and conclusion                                            60

7.1     Recommendation                                                           60

7.2     Conclusion                                                                     61

References                                                                      63

 

 

CHAPTER ONE

 

INTRODUCTION

          Bill of material processing can be described the compilation of the raw materials required to produce any desired product. This means billing the materials before processing so as to achieve a cost-effective production, avoiding less in buying the materials for production and also in the sale of products after production.

There are a lot of problems encountered in the manual bill of martial processing system. It is difficult to maintain the relationship between raw materials at the lowest level and the in which this raw materials are combined to form final products are not shown in the manual bill of material processing.

Most raw materials are used for more than one product. It becomes difficult to determine the final products in which a particular raw materials is used unless a separate record of the usage of raw materials is maintained.

In Nigeria, some companies are a manufacturing company that produces spare parts (ie motorcycle or motor spare parts).

Those companies are the producers of engine blocks, piston and Rings, brake shoes, Inner kick, Inner gear, con rod, clutch Fiber, Tyre and Tube etc. the bill of material processing system is operated manually.

Those involved are the production manager who is in charge of production. He lists all the raw materials that are needed for production. The stores manager takes Inventory of available raw materials and notes those that are not available. He then notifies the purchasing manager.

The purchasing manager who is the head of the purchasing department is also involved. He is responsible for buying and bringing down the materials from the source.

The Head of Finance and Accounts who is responsible for releasing funds for the purchase of raw materials.

Those people co0operate with the marketing department. This is because price of the raw materials may affect the price at which products are marketed.

This study involves an analysis of the manual system and the design of a new computer based system.