DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION (A CASE STUDY OF S.E.D.I ENUGU)
COMPLETE PROJECT MATERIAL COST 3000 NAIRA
WITH SOFTWARE FOR UNDERGRADUATE COST 20,000 NAIRA
A FRESH TOPIC NOT LISTED ON OUR WEBSITE COST 50,000 NAIRA ( UNDERGRADUATE) OR 100,000 FOR SECOND DEGREE STUDENTS. $500. PLUS FREE SUPPORT UNTIL YOU FINISH YOUR PROJECT WORK. CONTACT US TODAY, WE MAKE A DIFFERENT. DESIGN AND WRITING IS OUR SKILLED. DESIGN AND WRITING IS OUR SKILLED.
Note: our case study can be change to suit your desire location . we are here for your success.
ORDER NOW
Account Name : Chi E-Concept Int’l
ACCOUNT NUMBER: 0115939447
Account Name: Chi E-Concept Int’l
Account Name: 3059320631
Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
Account Number: 0117780667.
Swift Code: GTBINGLA
Dollar conversion rate for Naira is 175 per dollar.
ATM CARD: YOU CAN ALSO MAKE PAYMENT USING YOUR ATM CARD OR ONLINE TRANSFER. PLEASE CONTACT YOUR BANKER SECURITY GUIDE ON HOW TO TRANSFER MONEY TO OTHER BANKS USING YOUR ATM CARD. ATM CARD OR ONLINE BANK TRANSFER IS FASTER FOR QUICK DELIVERY TO YOUR EMAIL . OUR MARKETER WILL RESPOND TO YOU ANY TIME OF THE DAY. WE SUPPORT CBN CASHLESS SOCIETY.
OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.
form>DELIVERY PERIOD FOR BANK PAYMENT IS LESS THAN 2 HOURS
CALL Help Desk ON : 08074466939,08063386834.
AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO
08074466939 or 08063386834, YOUR PROJECT TITLE YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 2 HOURS ONCE WILL CONFIRM YOUR PAYMENT.
WE HAVE SECURITY IN OUR BUSINESS.
MONEY BACK GUARANTEE
ABSTRACT
The purpose of the study is to computerize quality control system for manufacturing organization (A case study of S.E.D.I Enugu) and to develop a computer package whereby the techniques observed from the manual method can be improved on. It is known fact that the manual method of quality control system in production has been associated with lots in inaccuracy in quality control and this has lead to early break down of parts when in service. The software with developed will facilitate and enhanced the mode and methods of quality control in spare production of S.E.D.I Enugu.
ORGANIZATION OF WORK
This research work is organized in seven chapters
CHAPTER 1:
This chapter highlights the purpose aims and objectives of the study, statement of the problem, scope and the elimination of the study, limitation and definition of terms.
CHAPTER 2:
This discuses on the review of the related literature.
CHAPTER 3:
This describes and analysis the existing system together with the fact finding method used organizational structure, objectives of the existing system, the input process, output analysis, the information flow diagram problems of the existing system and solution to the inherent problems facing the existing system.
CHAPTER 4:
This chapter deals on the design of the new system things in the present system and also the new structure that is needed to enhanced the new system. Furthermore file structure is design which can append record update records, delete record and print output.
CHAPTER 5:
It describes the programming phase and objectives, what the new system must input so that it can economically perform its designated tasks.
CHAPTER 6:
This describes the overall of the achievement of the project that has to be implemented in enhancing the growth of the new system.
CHAPTER SEVEN
This contents recommendation and conclusion of the works.
TABLE OF CONTENT
CHAPTER ONE
Introduction 1
Background of the study 5
Statement of the problem 7
Problems of the study 7
The purpose of the study 8
Scope 9
Aims and Objectives 9
Limitation of the study 10
Definition of term 10
CHAPTER TWO 13
Literature Review 13
CHAPTER THREE 15
Description and Analysis of the existing system 15
Fact funding methods 16
Organization structure 17
Objective of the existing system 18
Justification of the New system 20
CHAPTER FOUR 21
Design of the new system 21
Input specification and design 21
File design 21
Procedure chart 23
System flowchart 23
System requirement 24
CHAPTER FIVE
Implementation 25
Program design 25
Program Design 25
Psedocodues 29
Test Run
CHAPTER SIX 32
Documentation 32
CHAPTER SEVEN 35
Recommendation 35
References 38
CHAPTER ONE
1.1 INTRODUCTION
A quality control system in production management is a qualitative technique with strong financial implication having direct relationships with production, marketing, purchasing and financial policies.
Also, it is a system used in the management of manufacturing held by any organization as it concern addition to, storage and removal from the trading organization with appropriate record keeping.
S.E.D.I. Ltd, Enugu as an assembly plant maintains a large amount of stick vehicle spare parts which are imported from any of her vendor, Viz:- MBAG-Mercedes – Benz AG Germany, MBBRAS-Mercedes- Benz Brazil or MBE-Mercedes-Benz Espana for the production line or sales to distributions or authorized agents/dealers.
These stocks are held for various reasons among which are:
(a) To ensure unit sufficient goods are available to meet anticipated demand.
(b) To provide a buffer between production processes. This is applicable to work in progress stocks effectively decouple operation.
(c) To meet possible shortages in the future.
All these spare part, which may similar menu by description, varies greatly among themselves depending on the type of model of vehicle using them. Thus, the management and operation of stores functions and the control of stock can only be performed in an efficient manner when there is an appropriate means of upturning and storing information and the facility of the analysis and use of this information.
In the light of the above S.E.D.I. Ltd Enugu maintains a visible records system return to as KARDEX, As a prerequisite in any quality control system ANAMCO Ltd maintains a peculiar but unique coding system such that all the numerous spare parts are each uniquely coded and identified for accurate and specific information on them.
The operation of the KARDEX was of ten prove to redundancy or duplication of items when ever there is mistitling, it requires a lot of paper work with their possible variation or discrepancies during documentation; it involves, so many people thereby wasting a lot of man hours; increased cost of procurement storage of non-moving or obsolete items leads to customer dissatisfaction due to time wasting and unavailability of information. Thus, the efficiency of the system is greatly depending on human factor and as such accuracy.
So, it is an attempt to rectify and modify the above inadequacies that we have decided to develop and implement an integrated computerized stock control system so as to maximize the operation efficiency, ensure customers satisfaction based on quick services, minimize the non-hour requirement involved reduce the running costs, guarantee accuracy and at the same time generate report that assist management in her decision making as it concerns planning organizing and controlling.
1.2 BACKGROUND OF THE STUDY (MB-S.E.D.I LTD ENUGU)
Sequel to the recommendation of the fourth (4th) National Development plan in 1975 to increase the number of automobile plants in Nigeria in order to address the problem of transportation a Mercedes Benz plant was chosen. Other reasons for establishing the plant being to
(a) Transfer of technology (b) Manufacture and assembly of indigenous man-power training (c ) Modernisation of industrial workers and (e) Diversification and rapid industrialization of the Nigeria Economy.
MB-S.E.D.I. Ltd, as it is famously known and called means Mercedes-Benz Anambra Motor Manufacturing Company Limited Enugu. The company is strategically located along IBB-Airport Link Road Enugu Industrial Layout Enugu.
The pliant is a joint owned by the government and people of the Federal Republic of Nigeria and Daimier-Benz AG of