DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANIZATION

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED QUALITY CONTROL SYSTEM FOR A MANUFACTURING ORGANIZATION (A CASE STUDY OF S.E.D.I ENUGU)

Click here to download our android mobile app to your phone  for more materials and others

Note: our case study can be change to suit your desire location . we are here for your success.

ORDER NOW

COMPLETE MATERIAL  COST  N2,500 Or $10.  FRESH  PROJECT MATERIAL  COST 50,000 NAIRA FOR UNDERGRADUATE, OTHERS 100,000 -200,000 NAIRA.

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 GTBANK
Account Name : Host Link Global Services Ltd
ACCOUNT NUMBER: 0138924237
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

Note:  We accept bank transfer, ATM cash transfer , Online payment using your ATM , Western union bank transfer.  We will respond to you anytime of the day. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

CALL OUR  CUSTOMERS CARE  OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 1 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

ABSTRACT

The purpose of the study is to computerize quality control system for manufacturing organization (A case study of S.E.D.I Enugu) and to develop a computer package whereby the techniques observed from the manual method can be improved on. It is known fact that the manual method of quality control system in production has been associated with lots in inaccuracy in quality control and this has lead to early break down of parts when in service. The software with developed will facilitate and enhanced the mode and methods of quality control in spare production of S.E.D.I Enugu.

TABLE OF CONTENT

 

Table page                                                                               i

Certification                                                                            ii

Dedication                                                                               iii

Acknowledgement                                                                   iv

Abstract                                                                                  v

Organization of the Work                                                        vi-vii

Table of Content                                                                     viii

CHAPTER ONE

Introduction                                                                                      1

Background of the study                                                                   5

Statement of the problem                                                                  7

Problems of the study                                                             7

The purpose of the study                                                                  8

Scope                                                                                                9

Aims and Objectives                                                               9

Limitation of the study                                                            10

Definition of term                                                                    10

 

CHAPTER TWO                                                                            13

Literature Review                                                                    13

 

CHAPTER THREE                                                               15

Description and Analysis of the existing system                     15

Fact funding methods                                                              16

Organization structure                                                             17

Objective of the existing system                                              18

Justification of the New system                                                        20

CHAPTER FOUR                                                                 21

Design of the new system                                                        21

Input specification and design                                                         21

File design                                                                               21

Procedure chart                                                                       23

System flowchart                                                                    23

System requirement                                                                 24

CHAPTER FIVE

Implementation                                                                       25

Program design                                                                       25

Program Design                                                                       25

Psedocodues                                                                            29

Test Run

CHAPTER SIX                                                                      32

Documentation                                                                        32

 

CHAPTER SEVEN                                                               35

Recommendation                                                                     35

References                                                                               38

CHAPTER ONE

1.1     INTRODUCTION

          A quality control system in production management is a qualitative technique with strong financial implication having direct relationships with production, marketing, purchasing and financial policies.

Also, it is a system used in the management of manufacturing held by any organization as it concern addition to, storage and removal from the trading organization with appropriate record keeping.

S.E.D.I. Ltd, Enugu as an assembly plant maintains a large amount of stick vehicle spare parts which are imported from any of her vendor, Viz:- MBAG-Mercedes – Benz AG Germany, MBBRAS-Mercedes- Benz Brazil or MBE-Mercedes-Benz Espana for the production line or sales to distributions or authorized agents/dealers.

These stocks are held for various reasons among which are:

(a)     To ensure unit sufficient goods are available to meet anticipated demand.

(b)     To provide a buffer between production processes. This is applicable to work in progress stocks effectively decouple operation.

(c)      To meet possible shortages in the future.

All these spare part, which may similar menu by description, varies greatly among themselves depending on the type of model of vehicle using them. Thus, the management and operation of stores functions and the control of stock can only be performed in an efficient manner when there is an appropriate means of upturning and storing information and the facility of the analysis and use of this information.