DESIGN AND IMPLEMENTATION OF A SOFTWARE BASED QUALITY CONTROL SYSTEM

DESIGN AND IMPLEMENTATION OF A SOFTWARE BASED QUALITY CONTROL SYSTEM
(A CASE STUDY OF ANAMMCO NIG. LTD EMENE ENUGU )

Click here to download our android mobile app to your phone  for more materials and others

Note: our case study can be change to suit your desire location . we are here for your success.

ORDER NOW

COMPLETE MATERIAL  COST  N2,500 Or $10.  FRESH  PROJECT MATERIAL  COST 50,000 NAIRA FOR UNDERGRADUATE, OTHERS 100,000 -200,000 NAIRA.

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 GTBANK
Account Name : Host Link Global Services Ltd
ACCOUNT NUMBER: 0138924237
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

Note:  We accept bank transfer, ATM cash transfer , Online payment using your ATM , Western union bank transfer.  We will respond to you anytime of the day. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

CALL OUR  CUSTOMERS CARE  OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 1 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

 

ABSTRACT
The purpose of the study is to computerize quality control system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a computer packages whereby the technique observed from the manual method can be improved on.

It is a known feet that the manual method of quality control in production has been associated with lots of inaccuracy in quality control and this has lead to early break down of parts when in service.

The software when developed will facility and enhanced the mode and methods of quality control in spare parts production of Anamco.
TABLE OF CONTENTS
CHAPTER ONE
1.0 Introduction
1.1 Background information on Anammco
1.2 Justification of the project
1.3 Purpose of the study
1.4 Scope of study
1.5 Aims and objectives
CHAPTER TWO
2.1 Literature review
CHAPTER THREE
3.1 Description and analysis of the existing system
3.2 Fact finding methods
3.3 Organisation structure
3.4 Objectives of the existing system
3.5 Justification for the new system

CHAPTER FOUR
4.1 Design of the new system
4.2 Output specification and design
4.3 Input specification and design
4.4 File design
4.5 Procedure chart
4.6 System flowchart
4.7 System requirement

CHAPTER FIVE
5.1 Implementation
5.2 Program design
5.3 Program flowchart
5.4 Pseudocodes
5.5 Test run

CHAPTER SIX
6.1 Documentation

CHAPTER SEVEN
7.1 Recommendation
References
CHAPTER ONE
INTRODUCTION
A quality control system in production management is a qualitative technique with strong financial implications having direct relationships with production, marketing, purchasing and financial politics.

Also, it is a system used in the management of stocks held by any organisation as it concern addition to, storage and removals from the trading stock with appropriates record keeping.

ANAMMCO LTD, Enugu as an assembly plant maintains a large amount of stock vehicles spare parts which are imported from any of her vendors, Vce:- MBAG. Mercedes Benz AG Germany, MBBRAS. Mercedes – Benz Brazil or MBE – Mercedes. Benz Espama for the production line or sales to distributors or authorized agents dealers.

The stock are held for various among which are:-
(a) To ensure unit sufficient goods are available to meet anticipated demand.
(b) To provide a better between production processes.
This is, applicable to work in project stocks which effectively decouple operation.
(c) To meet possible shortage in future
(d) To absorb seasonal fluctuation in usage or demand.
(e) To enable production process to flow smoothly and efficiently.
(f) As a necessary part of the production process.
All these are logical yet, stocks accumulate due to the Less promise worthy reasons which are:-
(a) Obsolete items are retained in stock
(b) Poor or non-existing inventory control resulting in over targe orders, replacement orders being out of phase with production etc.
(c) Inadequate or non-existing stock records
(d) Marketing departments.

Whether as a deliberate policy or not, sticks, represents an investment by the organization. Thus, as with any other investment, the cost of holding stock most be related to the benefit to benefit to be gains. To do this effectively the cost must be identified and this can be done in the three categories:-
(a) Cost of obtaining stock
(b) Stock out costs.
All these spare parts which may how similar menu by description varies greatly among themselves depending on the type or model of vehicle using them. Thus, the management and operation of stories function and the control of stock on only be performed in on efficient manner when there is an appropriate means of up turning and storing information and a facility for the analysis and use of this information.
In the light of the above, ANAMMCO Ltd Enugu maintains a visible record system returned to as KARDEX, a manual form of inventory control system.

As a prerequisite in any quality control system, ANAMMCO Ltd maintains a peculiar but unique coding system such that all the numerous spare parts are each uniquely coded and identified for accurate and specific information on them.
The operation of the KARDX was often prove to redundancy or duplication of items whenever there is instilling; it requires a lot of paper work with their possible variations or discrepancies during documentation; it involves, so many people thereby investing a lot of man hours; increased cost of procure storage of non-moving or obsolete items leads to customer dissatisfaction due to time wasting and unavailability of information. Thus, the efficiency of the system is greatly dependent on human factor and as such accuracy.

So, it is an attempt to rectify and modify the above inadquaciets that we have decided to develop and implement on integrated computerized stock control system so as to maximize the operation efficiency, ensure customer satisfaction based on quick.
Services, minimize the non-hour requirement involved, reduce the running costs, guarantee accuracy and at the same time generate reports that assist management in her decision making as it concerns planning, organizing and controlling.
1.2 BACKGROUND OF THE STUDY (MB-ANAMMCO LTD) ENUGU.
After the recommendation of the fourth (4th) National Development plan in 1975 to increase the number of automobile plants in Nigeria in order to address the problem of transportation, a Mercedes Benz Plant was chosen. Other reasons for establishing the plant being to:
(a) Diversification and Rapid industrialization of the Nigeria Economy
(b) Modernization of industrial workers
(c) Indigenous man-power training
(d) Technology transfer and
(e) Manufacture and Assembly of Mercedes Benz commenced vehicles and trucks in Nigeria.

MB-ANAMMCO LTD, as it is famious by known and called means Mercedes-Benz Anambra motor manufacturing company limited Enugu. This company is strategically located along IBB A port link Road Enugu Industrial Layout Enugu.

The plant is a joint owned by the Government and people of the federal Republic of Nigeria and Daimier-Benz AG of Germany. Their share equity is in the ratio 60% to Nigeria and 40% to Daimier, Benz AG Germany.

Therefore Mercedes-Benz ANAMMCO LTD, Enugu was Licensed to manufacture Mercedes Benz commercial vehicles in Nigeria.

The company was incorporated in Nigeria as a private limited liability company on the 17th the day of January 1977. On the 12th day of May 1978, it’s foundation store was laid by colonel John Atom Kpera the then military Governor of ANAMBRA States (Now, ENUGU and ANAMBRA STATE). Later on the 8th day of June 1980, Mercedes-Benz ANAMMCO LTD, was commissioned by Alhaji Shehu Usman Aliyu Shagard, the them president Head of state and commander in client of the Nigeria Armed forces; ANAMMCO LTD, commenced production officially on January 1981. Ever since them her services network is speed throughout Nigeria. The company uses foreign and local contents in the manufacture of the Mercedes Benz commercial vehicles.
1.3 STATEMENT OF THE PROBLEM
It is a common knowledge that decision makers in any organization require information to perform the great functions of planning, producing and controlling. Therefore, it is necessary to discover and adequate means of making the information available to every on concerned. This is because, for decisions to be made correctly, the information must be consistent, accurate, timely and reliable.

Leave a Reply

Your email address will not be published. Required fields are marked *